DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-94Critical Reliability
5
6. Behind control carrier A of EPN cabinet 3:
■ Install a lightwave transceiver on cable connector at slot 3A02.
■ Connect the other end of the fiber optic cable to the lightwave
transceiver, just installed, at slot 3A02.
■ Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
■ At the top of the cabinet, coil the surplus fiber optic cable, and
carefully attach the coil to the wall of the cable tray.
7. Behind port carrier B of EPN cabinet 2:
■ Install a lightwave transceiver on cable connector at slot 2B03.
■ Connect 1 end of the fiber optic cable to the lightwave transceiver,
just installed, at slot 2B03.
■ Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
8. Behind port carrier B of EPN cabinet 3:
■ Install a lightwave transceiver on cable connector at slot 3B03.
■ Connect the other end of the fiber optic cable to the lightwave
transceiver, just installed, at slot 3B03.
■ Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
■ At the top of the cabinet, coil the surplus fiber optic cable, and
carefully attach the coil to the wall of the cable tray.