Lucent Technologies 555-233-115 Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-35Remove an EPN Cabinet from an Existing System
6
3. Type
change fiber link
and press Enter. The Fiber Link Administration
screen appears. Use this screen to unadminister fiber links, each of which
is identified by a fiber number.
a. The
Is one endpoint remoted via DS1 Converter
complex?
field must remain administered.
b. Remove the location of the TN570 and the TN574 or TN1654 circuit
pack for both ENDPOINT-1 and ENDPOINT-2.
4. Scroll to screen 2.
a. Type
no
, as applicable, in each
Facility Installed?
field (A,
B, C, and D).
b. The
Bit Rate:
field must remain administered if other fiber
connections associated with the facility will remain.
c. The idle code in the
Idle Code MSB (1) . . . . LSB (8):
field must remain administered.
d. The
Line Coding:
field must remain administered.
5. For a T1 site, proceed to
‘‘T1 Installations Only’’
. For an E1 site, proceed to
‘‘E1 Installations Only’’
.
T1 Installations Only
1. The
Framing Mode:
field is display only.
2. The
DS1CONV-1 Line Compensation:
and the
DS1CONV-2 Line
Compensation:
fields are display only.
3. Remove the
Facility Circuit ID:
from the facilities being
unadministered, if used. Press
Enter.
4. A display similar to the following appears after the procedure is
completed:
RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
.
E1 Installations Only
1. The
CRC?
field must remain administered.
2. The
Line Termination:
field is display only.
3. Remove the
Facility Circuit ID
information from the facilities being
unadministered, if used. Press
Enter.
4. A display similar to the following appears after the procedure is
completed:
RESET PORT-NETWORK 2 LEVEL 2 (COLD) PERFORMED
.