Lucent Technologies 555-233-115 Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-23Install a New EPN Cabinet in an Existing System
6
Connect Power and Ground
1. For an AC- or DC-powered system, connect power and ground to the
cabinet as instructed in
DEFINITY Enterprise Communications Server
Release 8 Installation and Test for Multicarrier Cabinets
.
2. Connect the approved ground to the new cabinet as instructed in
DEFINITY Enterprise Communications Server Release 8 Installation and
Test for Multicarrier Cabinets.
NOTE:
Do not power up the system until all power and ground connections
are completed.
Interconnect Cabling Release 8r
For fiber optic cabling information and comcode numbers, refer to
DEFINITY
Enterprise Communications Server Release 8 Installation and Test for Multicarrier
Cabinets
. The fiber connections installed in this section are later administered
using the fiber link administration instructions in
Appendix A, ‘‘Fiber Link
Administration’’.
NOTE:
Use multi-mode fiber transceivers and fiber optic cables between cabinets
unless single-mode is required for distance restrictions.
Direct-Connect New EPN to Existing PPN
(Standard Reliability)
Figure 6-14. Rear of J58890AH Control Carrier (PPN)
0063_0RBP 071096
98765
43 2 1
P1
P2
TERMINAL
DUPLICATION
OPTION
TERMINAL
PROCESSOR
INTERFACE
DATA
COMMUNICATION
EQUIPMENT
AUXCLOCK