Lucent Technologies 555-233-115 Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-72High Reliability
5
Power Up the EPN Cabinets
1. At each EPN power distribution unit, set the main circuit breaker to ON.
After about 40 seconds, EPN power and PPN/EPN communications return.
2. After power returns to each EPN and all trouble is cleared, verify that the
EMERGENCY TRANSFER CONTROL switch is set to AUTO. This restores
the system to the normal mode.
Retranslate Port Circuits
If port circuit packs in the G2 module control carrier were relocated in order to
put:
A critical port circuit pack, requiring longer nominal battery holdover (such
as a DS1 or an Announcement circuit pack), in a port slot
A TN736, TN752, or TN755 power supply in port slots “18” and “19”
A TN776 or TN570 Expansion Interface in port slot “1”
A TN776 or TN570 in port slot “2” (for a second directly connected EPN)
of the new expansion control carrier, verify that they were retranslated during the
off-site software upgrade. If not, they must be retranslated now. Refer to
DEFINITY Enterprise Communications Server Release 8 Administrator’s Guide
,
for instructions on performing the retranslations.
Enable TTI
1. Type
change system-parameters features
and press Enter.
2. On the second screen, set the
Enabled?
field to
y
to activate the TTI
feature.
Check Link Status
1. Type
display communication-interface links
and press Enter. Compare it
with the earlier status.
2. Type
status link
number
and press Enter. Repeat this step for each link.
Enable Scheduled Maintenance
Ty p e
change system-parameters maintenance
and press Enter. Enable the
scheduled daily maintenance.