4. INSTALLATION PROCEDURE FOR OPTIONAL EQUIPMENT EO18-33027
4.10 UHF RFID KIT (B-EX700-RFID-U2-US/EU/CN-R)
4-52
8. Put the Ribbon Guide on the Print Head Block.
c First insert the shaft of the Ribbon Guide on this side, then the other side into the holes of the
removed Ribbon Guide Shaft.
d Push up the Ribbon Guide so that the hooks are placed onto the right-hand Ribbon Guide Shaft.
4.10.3 Attaching the Antenna Ass’y
Assembling the Antenna Ass’y
1. Connect the Antenna Cable to the Antenna until it clicks.
Antenna Cable
Antenna
Connector
Insert this side first.
Hook
Ribbon Guide Shaft
Ribbon Guide