Important
When you install the oiler-belt rolls, you must line up the notches in the
rolls with the tabs on the sprocket. If you do not do this, the oiler belt
does not advance correctly. This causes reduced print quality.
15. While you hold the upper (larger) roll against the lower roll, do the following:
a. Place the right end of the upper roll on the sprocket, lining up the notches
in the roll to the tabs on the sprocket. Press the upper roll to the right,
against the spring.
b. Place the left end of the upper roll on the sprocket, and let the right
spring-loaded sprocket hold the roll in place.
16. Working with the lower roll, repeat step 15.
Note: The oiler belt must be under the tab (1).
17. Rotate the upper oiler-belt roll to remove slack in the belt.
18. If you are changing the oiler belt and you removed the oil pan that is shown
above in step 7 on page 207, reinstall the pan now.
19. Raise the hot roll shield.
20. Close the oiler-belt gate.
21. Turn the wing nut clockwise to latch the gate. Ensure that the gate is firmly
latched.
22. Close the stacker end cover.
23. The message may change to WARMING UP or PLEASE STAND BY.
HC6OG073
1
210 InfoPrint 3000 Operator’s Guide
|
|
|