9
Configuring Tape Device Extension
9-9
Configuring Tape Device Extension
4. Setting the Initial Configuration
5. Setting the License Information
6. Adding an IP Circuit
7. Creating a Data Path for Fibre Channel Device Extension
Interfaces
a. Optional Step: Static Mapping the LUNs and Filtering the
Source WWN
8. Delivering the Configured Network
NOTE: Fibre Channel Switch Zoning, Static Edge LUN Mapping, and Source
WWN Filtering may or may not be needed depending upon the type of
network you are configuring. If Fibre Channel Switch Zoning is needed, do
this step before using UCM to configure the Edge. See the sections, “Required
Static Edge LUN Mapping” (page
-5) and “Required Source WWN Filtering”
(page -7) to determine if these steps are needed.
There are three different examples shown in the “Network
Configuration Examples” section, to be used as references to
determine when Fibre Channel switch zoning, statically mapping the
LUNs, and source WWN filtering are required.
If your network requires static mapping or source WWN filtering,
perform all the steps shown in the above list including the optional
step “Static Mapping the LUNs and Filtering the Source WWN”.
Perform the “Delivering the Configured Network” step last.
NOTE: For help on the configuration process, click the Help button in UCM
on the active dialog box or press the F1 key.
Gathering the IP
Addresses
Before starting the configuration procedure in ConfigManager you
will need to gather the IP addresses for your network. The IP host
addresses and the completed UltraNet Edge Storage Router
Configuration IP Address Worksheet from Appendix J will be used in
the configuration process. The worksheet is referred to as the
Configuration IP address Worksheet throughout the remainder of this
chapter.
You will need the following addresses:
• UltraNet Edge 3000 Ethernet Maintenance Interface host IP
address