Hardware Maintenance
12-1
12
Hardware Maintenance
The UltraNet Edge 3000 does not have scheduled maintenance
requirements. In the event of failure, contact Customer Support for
individual component replacement or whole unit replacement.
This chapter provides removal and replacement procedures for the
UltraNet Edge 3000 Field Replaceable Units (FRUs):
• UltraNet Edge 3000 Chassis
• Fan Assembly
• Power Supply
• Fibre Channel interface card
• 10/100 Ethernet interface card
• Gigabit Ethernet interface card
• OC-3 ATM interface card
• Gigabit Ethernet Short Wave SFP Transceiver
• Gigabit Ethernet Long Wave SFP Transceiver
• Gigabit Ethernet Copper Transceiver
• OC-3 ATM Short Wave SFP Transceiver
• OC-3 ATM Long Wave SFP Transceiver
• Fibre Channel Short Wave SFP Transceiver
• Fibre Channel Long Wave SFP Transceiver