B-1
B
Installation and Cabling
This appendix provides installation and cabling information for the
UltraNet Edge 3000.
Overview
The UltraNet Edge 3000 host and network I/O hardware components
have been pre-installed. You are responsible for the following:
• Review the site-preparation requirements in Appendix A, Site
Preparation before installing the UltraNet Edge 3000 hardware.
• Decide on unit placement.
• Unpack and inspect the UltraNet Edge 3000 unit.
• Take an inventory of UltraNet Edge 3000 components.
• Ensure that ESD procedures are followed, see “Cables and
Equipment” on page -14.
• If the UltraNet Edge 3000 is placed in a rack mount, attach
mounting brackets to the front corners of the unit.
• Mount UltraNet Edge 3000 on the equipment rack (or place in
tabletop position).
• Acquire and attach the appropriate cable types and lengths.
NOTE: After hardware installation is complete, use the UltraNet
ConfigManager configuration application to perform your network
configurations.