Initial Power-On Procedure
5. Turn the power switch(es) to the On () position (this activates the
systems initial loading routine). The power switch is located
directly above the power cord, see
Figure B-4.
Verify status with the indicator lights and the Alphanumeric
messages window display on front of the unit. (See the
“Indicators,
Switches, and Interfaces” section in Chapter 2 for descriptions of the
indicators and alphanumeric displays or the “LED Diagnostic Codes”
section in Chapter 13, Troubleshooting and Diagnostics).
Figure B-4 Power Supply Switch
After power up, the diagnostic display will toggle between VXOK
and BOTP. The UltraNet Edge 3000 is then ready for the UltraNet
ConfigManager configuration.
Figure B-5 Diagnostic Display