12
Hardware Maintenance
12-9
Fibre Channel Interface Card Removal Procedure
CAUTION
Make sure the power is off. Attach a wrist strap and follow ESD
procedures during the handling of all electronic components.
NOTE: When placing the top cover onto the chassis, ensure the fan wires and
DC wires are clear of the UltraNet Edge 3000 chassis. This is to prevent any
pinched wires.
1. Attach the UltraNet Edge 3000 top cover to the UltraNet Edge
3000 by pressing the cover into place and then sliding the cover
forward so that it fully covers the top of the front brace bracket.
2. Secure the cover using the four screws that were made available
during the removal procedure. Torque to 6 in-lbs.
3. Reconnect the power cords (rear).
4. Turn on the power supplies.
Fibre Channel Interface Card Removal Procedure
Use the following procedure to remove the Fibre Channel (FCBB)
interface card from the UltraNet Edge 3000.
Tools required: A small Phillips screwdriver and an adjustable
Torque driver, rated between 3 and 15 in-lbs.
CAUTION
Attach a wrist strap and follow ESD procedures during the
handling of all electronic components.
1. Follow the Top Cover Removal Procedure.
2. Turn off both power supplies on the UltraNet Edge 3000.
3. Unplug the power cords.
4. Locate the Fibre Channel interface card.
The Fibre Channel interface card is located on the front right side
of the UltraNet Edge 3000 and can occupy I/O 1 and I/O 2 (see
illustration below).