Toshiba VF-S9 Power Supply User Manual


 
E6580757
G-3
7
(7) Preset-speed setting (8) Voltage/current switching
F
R
RST
S1
S2
S3
CC
PP
VIB
II
VIA
CC
RUN
STOP
F
R
RST
S1(FCHG)
S2
S3
CC
PP
VIB
RUN
STOP
CC
II
VIA
Current
signal
Voltage signal
to : 7-speed run
to : 8-speed run
To select 7-speed run, use the terminals S1 to S3.
To select 15-speed run, add the terminal S4.
(Automatic switching)
(Forced switching of FCHG. Enter “38” as the
S1 terminal function selection. ON: VIB,
OFF:VIA/II)
(9) Analog addition setting (10) Switching between external contact UP/DOWN
and VIA input
F
R
RST(PNL/T
S1 (Up)
S2 (Down)
S3 (Clear)
CC
PP
VIB
II
VIA
CC
RUN STOP
F
R
RST
S1
S2
S3
CC
PP
VIB
II
RUN
STOP
VIA
CC
Current
signal
Voltage signal
(VIA/II+VIB)
To switch to VIA/II setting, use the external
PNL/TB.
Operation panel key operation is enabled when
the external contact UP/DOWN is disabled.