Epson 7600 Printer User Manual


 
EPSON Stylus Pro 7600/9600 Revision A
Adjustment Overview 213
5.1.4.2 Main Board Adjustment
Described below are the adjustment items to be made once the MAIN Board (C472
MAIN) (p.207) has been replaced.
Adjusting tools:
A3Tracing Paper #F751(Microtrace #300 LMB)
A3 Copy Paper (PPC)
Scale 1000mm #F713
Scale Stopper #F714
Work operations before adjustment:
Parameter Backup (p.218)
Firmware Reinstallation (p.219)
Adjustment items (steps):
Note "*1": Adjustment procedure when parameter backup has been executed
"*2": Adjustment procedure when parameter backup can not be executed
Work operations after adjustment:
Replacing the maintenance tank and resetting the maintenance tank life
counter
1. Replace the maintenance tank with a new one.
2. Start Maintenance Mode 2.
(Power OFF [Paper Source]+[Eject]+[Paper Feed] Power ON)
3. Clear the counter.
(“CLEAR COUNTERS”“MAINTE. TANK”)
NOTE:
For details, refer to
1.4.5 Maintenance Mode 2” (p.70)
.
C H E C K
P O I N T
When “Parameter Backup” has been executed, make the
adjustment by Procedure A in Table 5-4 below; there is no need of
following Procedure B.
Table 5-4. Required Adjustment Items (Main Circuit)
Procedure
A*
1
Procedure
B*
2
Adjustment Item See
<Start the Self-diagnostic Function>
(Power OFF
[Paper Feed
]
+
[Paper Feed
]
+[Cut/Eject] Power ON)
p.220
1 1 Rear Sensor AD Adjustment p.231
2 2 Edge Sensor AD Adjustment p.232
3 Initial Charge Flag Clear p.257
4 Head Rank ID Checking
5 Head Rank Input p.233
6 Head Nozzle Checking (Cleaning) p.237
7 Head Slant Checking p.246
8 Feed Correction + T&B Adjustment p.239
9 Rear Sensor Position Adjustment p.243
10 Platen Position Adjustment (Flash Point Adjustment) p.244
11 Round Trip Print Position Adjustment (Bi-D Adjustment) p.248
12 Round Trip Print Position (Bi-D Adjustment) Checking p.252
13 Head Gap Adjustment (Uni-D Adjustment) p.253
14 USB ID Input p.273
3 15 RTC writing initialization p.71
16 Power Cleaning p.259
17 Head Nozzle Checking (Cleaning) p.237
18 Test Pattern Printing p.255
Table 5-4. Required Adjustment Items (Main Circuit) (continued)
Procedure
A*
1
Procedure
B*
2
Adjustment Item See