Fujitsu C122-E177-01EN Computer Hardware User Manual


 
MMB Web-UI (Web User Interface) Operations
FIGURE 1.39 [Power Control] Window (Grayout Display)
1. Select the process executed for the partition from Pull-down menu of [Power Control].
Then, click the [Apply] button.
Dialog box for confirmation appears.
2. Click the [OK] button to execute the process.
Click the [Cancel] button to cancel the process.
When Partition Power is On, or when Power is Off, and when the specified control is failed,
Warning dialog box appears.
When the CPU mounted on the SB of partition is not matched at the time of specifying the Power On of
partition, Warning dialog box appears. Error occurs in the Power On operation.
TABLE 1.56 Display Items and Set Items of [Power Control] Window
Items
Description
# Displays the number by which the partition is identified.
[In case of the PRIMEQUEST 2800E model]
There are 0-3 Partitions.
However, only the partitions with SB and IOU registration are displayed.
P#
Displays only In case of the PRIMEQUEST 2800E model.
Partition Name
Displays the name of the Partition.
Power Status Displays the Power Status of the Partition.
On
Standby
System Progress The status of the partition progress is displayed.
Power Off: The partition power is off.
Power On In Progress: Partition power on is in process.
Reset: The status of the partition from the beginning of reset till the
completion of the operating system boot.