MMB Web-UI (Web User Interface) Operations
If the schedule is to be changed
1. Select an existing schedule with [Radio] button.
2. Click [Edit] button.
[Add/Edit Schedule] window appears.
3. Changes an existing schedule in [Add/Edit Schedule] window.
If the schedule is to be deleted
1. Select the schedule with [Radio] button.
2. Click [Remove] button.
The confirmation dialog box appears.
3. Click [OK] button.
Deletes the schedule.
[Message]
This section describes the messages to be displayed on this window.
Message Number
Message
I_00013
Setting completed.
E_00412
You need an empty entry.
W_00413
Nothing is selected.
For details on the messages displayed on the window, see PRIMEQUEST 2000 Series Message Reference
(C122-E178EN).
[Add Schedule] window/ [Edit Schedule] window
In [Add Schedule] window, the schedule of Power On / Off for each partition, can be added newly.
In [Edit Schedule] window, an existing schedule can be changed.
The window items of [Add Schedule] window and [Edit Schedule] window are common.
In this section, an explanation is given by using the [Add Schedule] window.
FIGURE 1.106 [Schedule List] Window