MMB Web-UI (Web User Interface) Operations
(2) Window Operations
1. Click the [Status Clear] button. Selects the power control items related to each partition from the pull-
down list of [Power Control]. Then click the [Apply] button.
Dialog box for setting confirmation appears.
2. Click [OK] button to execute the settings.
[Message]
This section describes the messages to be displayed on this window.
Message Number
Message
E_00075
Partition#aa cannot execute sadump
E_00077
Partition#aa cannot execute Power On.
E_00078
Partition#aa cannot execute Power Off.
E_00079
Partition#aa command failed
E_00080
Partition#%aa cannot execute Power Cycle.
E_00081
Partition#%aa cannot execute Reset.
E_00082
Partition#%aa cannot execute NMI.
E_00084
Partition#%aa cannot execute Force Power Off.
E_00091
Force Power Off Delay setting failed.
E_00101
Unable to power on the partition#%aa due to CPU mismatch between SBs.
I_00214
Unable to Power On the Partition#%aa because this Partition is under maintenance.
I_00222
Unable to %aa the Partition#%aa because this Partition is under maintenance.
E_00422
Unable to power on the partition#%aa due to CPU composition abnormal.
E_00154
Unable to power on due to mismatch between supply voltage and input voltage.
E_00482
Unable to power on the partition#%aa due to DIMM composition abnormal.
E_00491
Unable to power on the partition#%aa due to DIMM does not satisfy requirements of
Mirror Mode.
W_00504
The Power On failed, because of switching the Home SB.
Please execute it after a while again.
E_00517
Unable to power on the partition#%d due to abnormal SB composition.
E_00522
Unable to power on the partition#%d due to abnormal VRM composition.
For details on the messages displayed on the window, see PRIMEQUEST 2000 Series Message Reference
(C122-E178EN).
1.3.2 [Schedule] Menu
The [Schedule] menu has the [Schedule Control] and [Schedule List] windows. This section describes the
windows and the operation.
Note
As mentioned below, there may be a delay in the time recorded in SEL compared to the time reserved for
scheduled operations.
After checking the configuration and after performing the start up preparation process, it takes some
time until the power is ON. In this case, the SEL display is delayed about from six seconds up to 8
seconds than the time reserved for the scheduled operations.
The shutdown instructions from MMB to OPERATING SYSTEM take certain time from the set time.
However, the following interval times may be changed under the various conditions like setting and the
configuration.
Interval time until shutdown instructions reaches OS from MMB.
Interval time until MMB notifies SEL begin shutdown after OS begins shutdown.
Even if the [Power on Delay] is 0 seconds, it takes about 30 seconds ~ 70 seconds from starting the
power on up to the reset.
[Schedule Control] window
In the [Schedule Control] window, the setting related to the schedule can be set for each partition.