Lincoln Electric SVM112-B Power Supply User Manual


 
T1 AUXILIARY TRANSFORMER REMOVAL AND REPLACEMENT
Service and repair should be performed by only Lincoln Electric factory trained personnel.
Unauthorized repairs performed on this equipment may result in danger to the technician or
machine operator and will invalidate your factory warranty. For your safety and to avoid elec-
trical shock, please observe all safety notes and precautions detailed throughout this manual.
If for any reason you do not understand the test procedures or are unable to perform the
test/repairs safely, contact the Lincoln Electric Service Department for electrical trou-
bleshooting assistance before you proceed. Call 1-800-833-9353 (WELD).
DESCRIPTION
The following procedure will aid the technician in removing the T1 auxiliary transformer for
maintenance or replacement.
MATERIALS NEEDED
5/16" Nut driver
3/8" Nut driver or socket wrench
Wire cutters
Machine Wiring Diagram in the Electrical Diagrams section of this manual
WARNING
TROUBLESHOOTING & REPAIR
F-155 F-155
POWER WAVE 450
Return to Section TOC Return to Section TOC Return to Section TOC Return to Section TOC
Return to Master TOC Return to Master TOC Return to Master TOC Return to Master TOC
This procedure takes approximately 35 minutes to perform.