Cisco Systems MGX 8950 Switch User Manual


 
3-3
Cisco MGX 8950 Hardware Installation Guide
Release 3, Part Number 78-14147-02 Rev. A0, November 2002
Chapter 3 Installing a Cisco MGX 8950
Installation Checklist
Step 5
Install the AC Power Supply
Tray(s), page 3-15, as
necessary
Remove the AC Power
Supplies from the AC
Power Tray, page 3-16
Install the AC Power
Tray, page 3-17
Install the AC Power
Supplies in the Trays,
page 3-18
Install the AC Power Supply
Tray(s), page 3-15, as
necessary
Remove the AC Power
Supplies from the AC
Power Tray, page 3-16
Install the AC Power
Tray, page 3-17
Install the AC Power
Supplies in the Trays,
page 3-18
Connect the DC PEM to the
Cisco MGX 8950 Switch,
page 3-39, as necessary
Step 6
Install the Air Intake Plenum,
page 3-18
Install the Air Intake Plenum,
page 3-18
Connect the Back Cards, page
3-43
Step 7
Install the Lower Fan Tray,
page 3-19
Install the Lower Fan Tray,
page 3-19
Connect the Console Port,
page 3-44
Step 8
Install the Cisco MGX 8950
Switch—Without a
Mechanical Lift, page 3-20
Prepare for Installation,
page 3-20
Remove the Front Cards,
page 3-20
Remove the Back Cards,
page 3-22
Remove the Back Cards
from an APS Assembly,
page 3-22
Install the Switch in the
Rack, page 3-23
Reinstall the APS
Assembly, page 3-24
Reinstall the Back Cards,
page 3-27
Reinstall the Front Cards,
page 3-28
Install the Cisco MGX 8950
Switch—with a Mechanical
Lift, page 3-29
Install the Switch in a
19-Inch Rack, page 3-30
Install the Switch in a
23-Inch Rack, page 3-30
Connect Power to the Cisco
MGX 8950 Switch, page 3-45
Connect AC Power to the
Switch, page 3-46
Connect DC Power to the
Switch, page 3-49
Table 3-1 Installation Checklist—Cisco MGX 8950 System (continued)
Check Steps
Rack Mounted System (without
Lift) Rack Mounted System (with Lift) Cisco Cabinet System