Task table
Issue 10 June 2005 207
Usable circuit packs
Every circuit pack must conform to the minimum usable vintage requirements for that system. At
a presale site inspection, the remediation process checks the vintages of existing circuit packs
to be reused. Replace all unusable vintage circuit packs with current vintages.
Wireless systems
If the system uses Wireless Business System, you need to re-enable the radio controllers after
the upgrade. Refer to Chapter 1, “UTAM Disablement” in the DEFINITY Wireless Business
System Maintenance book. Refer also to Chapter 2, “Switch Administration” in DEFINITY
Wireless Business System Installation and Test.
Note:
Note: Only the init login can perform this activity.
Antistatic protection
!
CAUTION:
CAUTION: When handling circuit packs or any electronic components, always wear an
antistatic wrist ground strap. Connect the strap to an approved ground such as
ground jack on the cabinet.
Task table
Table 47 provides the high-level tasks to perform the upgrades in this section. Refer to the
appropriate page for instructions for each step.
Table 47: Tasks to upgrade Release 9/10 csi to Avaya Communication Manager
✔
Task Description Page
Pre-upgrade checklist 209
Go to the RFA website 211
Check SPE 218
1 of 2