IBM SY44-5902-05 Server User Manual


 
C200 4300
Preparing connection to load source device
C200 43FF
Load source device is connected
C200 5xxx
Secondary Partition Main Storage Dump Phase
C200 5100
Preparing to initiate MSD phase
C200 5110
Loading SID 82 from load source device
C200 5115
MSD Phase I
C200 5120
Writing processor registers into SID 82
C200 5125
MSD Phase II
C200 5130
Writing mainstore pages to the load source device
C200 5135
MSD Phase III
C200 5140
Storing (final) SID 82 back to the load source device
C200 5150
Allocating the hardware page table
C200 51FF
MSD processing complete
C200 6xxx
Secondary Partition Load LIC From Load Source Phase
C200 6000
Locating First LID information on the loadsource
C200 6010
Locating Next LID information on the loadsource
C200 6020
Verifying LID information
C200 6030
Priming LP Configuration LID
C200 6040
Preparing to initiate LID load from loadsource
C200 6050
LP Configuration LID primed successfully
C200 6060
Waiting for LID load to complete
C200 6100
LID load completed successfully
204 Service Functions V5R2