IBM SY44-5902-05 Server User Manual


 
Index
A
abbreviations 325
acronyms 325
action log 56
activate remote service 173, 189
active service tools, work with 24
adapter card pin wiring charts 244
address space environment, private 201
address, display 67, 106
advanced program-to-program
communications (APPC)
definition 325
AER 325
alternate installation
alternate installation IPL device 27
IPL 27
load source 27
alternate installation device 325
alternate installation IPL 218
definition 325
alternate installation media
definition 325
alternate IPL
See also Licensed Internal Code
definition 327
alternate IPL indicator (=) 93
alternate IPL procedure 8
alternative console, determining 128
analyze log 102
APAR (authorized program analysis
report) 228
APAR information to gather 293
assign missing units option 21
associated logical resources
displaying 67
asynchronous log report 220
attended IPL 159
definition 325
authority, user IDs 25
authorized program analysis report
See APAR
automatic configuration indicator
(QAUTOCFG) system value 299
automatic installation of the operating
system option 39
B
B143 4999 193
battery capacity test 234
battery power unit 55, 230
battery test 234
BBBB Ccbb 325
break mode 292
BSC 326
bus error URCs 200
bypass system password 126
C
cable pin wiring charts 244
card gap information, displaying 69
card pin wiring charts 244
change detail, option under hardware
service manager 61
change IPL speed
CHGIPLA 217
function 02 217
change Service tools user IDs option 25
change system password 126
change system unique identifier 127
change system value 298
change transmit level (CHGXMTLVL)
command 301
CHGSYSVAL (change system value)
command 298
clustering service reference procedures
determining if a tower is configured
as switchable under
OptiConnect 149
determining if the system has guest
partitions 148
determining the hosting partition of a
guest partition 149
determining the release level of a
guest partition 148
determining the resource name and
HSL loop number of an HSL I/O
bridge 152
determining the SPCN (power)
controlling system of a tower 150
switching ownership of a towers
switchable resources 154
switching the mode of a towers
switchable resources 156
code groups 225
codes
overview
SRCs 196
URCs 196
SRCs
exception 196
general status 193
IPL status 193
operating intervention 193
reference 196
URCs
bus errors 200
common error types 200
communications 200
database 200
DST status 200
exception management 200
Hardware-related errors 200
I/O DASD subsystem 200
I/O hardware error 200
I/O HRI 201
I/O processor failure 200
install IPL status 200
IPL 200
codes (continued)
URCs (continued)
IPL status 200
IPL status for database 200
IPL URCs for continuously
powered main storage 200
IPL URCs for DST status 200
IPL URCs for main store
dump 200
journal 200
LIC 199
LIC common machine check 200
LIC error 201
LID manager 200
link loader 200
link loader and IPL status 200
logical partition configuration 200
LPAR 198
machine check handler 199
Modula 2 200
MSD from hypervisor 200
MUTEX 200
Optical I/O Subcomponent 201
power IPL status 200
process management 200
queuing 200
reclaim 200
remote DST 201
resource management 200
source/sink 200
storage management 199
storage management IPL
status 200
tasking 200
translator 200
UPS interface 200
command keys 289
commands, service 296
common type URCs 200
commonly used service commands 296
communications interface trace test 316
carrier detect 317
data set ready 317
data terminal ready 317
ready for sending 317
request to send 317
communications link test 312
communications pin wiring charts 244
communications trace
controller description 35
deleting 33
exiting 36
format and print 36
format and trace 33
formatted data 37
limitations 39
line description 35
start trace function key 34
status conditions 33
stopping 33
communications URCs 200
© Copyright IBM Corp. 1997, 2002
331