C600 4508
Verifying system password (if DASD check OK)
C600 450A
Starting ’after DST’ DASD checker
C600 450C
DST IPL status
End of DST SRCs for Unattended IPLs.
C600 4A57
Parallel database recovery is at Pass 1
C600 4A60
Parallel database initialization is at Pass 1
C600 4B57
Parallel database recovery is at Pass 2
C600 4B60
Parallel database initialization is at Pass 2
C600 4C57
Parallel database recovery is at Pass 3
C600 4C60
Parallel database initialization is at Pass 3
C600 4F57
The system is recovering all database objects. This step can take several
hours. It can occur any time when database recovery is in progress.
C600 4F60
The system is examining all objects during database initialization. It can
occur any time when database initialization is in progress.
Note: At this point LIC initialization is complete, and operating system starts. All
hardware is verified.
IPL SRC
Function Performed
If the system uses the OS/400 operating system, the following status SRCs appear:
C900 2810
Reclaim machine context
C900 2820
Resolve system objects
C900 2825
Convert Work Control Block Table
C900 2830
System value object
C900 28C0
Prepare SPCF job
C900 28C5
Initialize system objects
C900 2910
Start system logging
Chapter 6. System Reference Code (SRC) Information 211