Raritan Computer 4.7 Switch User Manual


 
Chapter 10: Configurations
149
2. Recycle the power of all impacted devices. This is recommended to
build a clean database for Paragon switches. Sequence of recycling
power is from the HIGHEST tier (third tier) to the Base Unit. In our
example: UMT-3A --> UMT-2A --> UMT-2B --> UMT-2C --> UMT- 1A
--> UMT-1B.
Example B: Relocating a second-tier device with multiple base
connections (refer to blue line in the diagram):
1. Disconnect some or all of the user ports on a tiered device (UMT-2C)
that connect to the channel ports of a Base Unit (UMT-1A) and
re-connect those user ports to another Base Unit (UMT-1B).
2. Recycle the power of impacted devices. This is recommended to
build a clean database for Paragon switches. Sequence of recycling
power is from the HIGHEST tier (second tier) to the Base Unit. In our
example: UMT-2C --> UMT-1A --> UMT-1B.
The operation is the same for tiered devices that are not Paragon
switches.
Red color
Example A
Blue color
Example B