Note -
For a building block configuration, press the power switch on the master chassis. The
power switches of the other chassis are disabled.
than 4 second s).
For details, see "2.2.2 Control function of the operation panel."
6.5 Restoring the Chassis
This section describes operations required to restore the chassis.
6.5.1 Installing the power cord
If the power cord of the SPARC M10-4S or the crossbar box was removed to perform
the maintenance work, connect the power cord and then attach the cable clamp to the
power cord.
1.
Connect the power c ord of th e SPARC M10-4S to the PSU b ac kplane unit, or
connect the power cord of t he crossbar box to the po wer s upply unit.
Figure 6-1
Installing the power cord (SPARC M10-4/M10-4S)
Fujitsu M10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual
・
December 201376