Note -
In the case of a dual power feed, connect the power cords in their original positions by
referring to the record that you made before the start of maintenance.
2.
Return to the operation of the XSCF firmw are replacefru co mman d to confirm
that th e chassis has been incorpor ated into the system.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
3.
Close t h e rack d oor.
26.6.3 Inactive/Hot maintenance
1.
Return to the operation of the XSCF firmw are replacefru co mman d to confirm
that th e chassis has been incorpor ated into the system.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
2.
Power on th e physical p artition r equ iring maintenanc e.
For details, see "6.3 Powering On the Physical Partition Requiring Maintenance."
3.
Close t h e rack d oor.
26.6.4 Inactive/Cold maintenance
1.
Connect all the po wer c ords to the PSU backplane unit or power supply u nit
of th e chassis r equ iring maintenance.
For details, see "6.5.1 Installing the power cord."
2.
Return to the operation of the XSCF firmw are replacefru co mman d to confirm
that th e chassis has been incorpor ated into the system.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
3.
Power on th e physical p artition r equ iring maintenanc e.
For details, see "6.3 Powering On the Physical Partition Requiring Maintenance."
4.
Close t h e rack d oor.
26.6.5 System-stopped maintenance
1.
Connect all the po wer c ords to the PSU backplane unit or power supply u nit
of th e chassis r equ iring maintenance.
For details, see "6.5.1 Installing the power cord."
Chapter 26 Maintaining the XSCF BB Control Cables 411