Fujitsu M10-4 Server User Manual


 
Note -
Check that XSCF DUAL control cable is correctly connected and secure.
Note - After connecting the XSCF DUAL control cable, use the hook-and-loop fastener to
bundle the cables together and fasten them to rear cable support.
2.
Remove th e XSCF DUAL control cables from the other ch assis.
Pull out the XSCF DUAL control cable while pushing the lock release buttons on
the both sides of the cable.
27.5 Installing an XSCF DUAL Control
Cable
This section describes the procedure for installing an XSCF DUAL control cable.
1.
Attach th e supplied connection destination lab el to the replacement X SCF
DUAL control cable.
For the new XSCF DUAL control cable, use the same type of label as the one on
the cable requiring maintenance and write the same port number on it.
2.
Connect the XSCF DUAL control cable to SPAR C M10-4S or the c rossb ar box.
27.6 Restoring the System
This section describes the procedure for restoring the system after installing the XSCF
DUAL control cables. The restoration procedure differs depending on the maintenance
type as follows:
Active/Hot maintenance
Active/Cold maintenance
Inactive/Hot maintenance
Inactive/Cold maintenance
System-stopped maintenance
27.6.1 Active/Hot maintenance
1.
Return to the operation of the XSCF firmw are replacefru co mman d to confirm
that th e XSCF DUAL co ntrol cable has b een incorporated into the syste m.
For details, see "6.1 Incorporating an FRU into the System with the replacefru
Command."
2.
Execute the sho w status command to confirm t h at the FRU is o perating
Chapter 27 Maintaining the XSCF DUAL Control Cables 421