Note -
Reconnect the power cords at their original locations by referring to the notes you
made prior to the start of maintenance.
Note -
Reconnect the power cords at their original locations by referring to the notes you
made prior to the start of maintenance.
■
System-stopped maintenance
29.6.1 Active/Cold maintenance
1.
Connect all t he power cords of the SP ARC M10-4S and crossbar boxes to the
PDU requiring maintenance.
2.
Close t he rack d oor.
29.6.2 System-stopped maintenance
1.
Connect all t he power cords of the SP ARC M10-4S and crossbar boxes to the
PDU requiring maintenance.
2.
Start th e entire system.
For details, see "6.4 Starting the Entire System."
3.
Close t he rack d oor.
Fujitsu M10-4/Fujitsu M10-4S/SPARC M10-4/SPARC M10-4S Service Manual
・
December 2013462