Front
Note -
Place the removed operation panel on a grounded antistatic ESD mat.
Figure 23-7
Removing the operation panel
23.5 Installing the Operation Panel
This section describes the procedure for installing the operation panel.
Chapter 23 Maintaining the Operation Panel of the Crossbar Box 375