IBM AS/400e Computer Hardware User Manual


 
OUTQ
The connection has ended, and job information is available. Select option 14 to
display the job information.
JOBQ
A request to start the connection was submitted. The job is waiting on the job
queue.
STRSSN
A job is starting for this profile, but has not yet completed.
ENDSSN
The connection for this profile is ending.
JOBLOG
The connection for this profile has ended, and AS/400 is placing information in
the job log for this job.
ADDTCPCFG
TCP/IP interface address information is being added for the connection.
RMVTCPCFG
TCP/IP interface information is being removed from the connection.
MSGW
An inquiry message was sent to either the QTCP or to the QSYSOPR message
queue. Job connection processing is suspended until you respond to the inquiry
message.
SSNERR
An error occurred while the connection was established. To find out more about
the error, type option 14 next to the configuration profile name to run the
WRKJOB command.
STRTCPCMN
Starting TCP/IP communications. AS/400 is starting the SLIP protocol jobs.
ENDTCPCMN
Ending TCP/IP communications.
DIAL
AS/400 is calling the remote system to establish the connection.
RINGW
For a *ANS session that is waiting for someone to call.
CNNDIALOG
Connection dialog information is being exchanged over this connection.
ACTIVE
Connection has been made, and the job is running.
ICFERR
An error occurred during intersystem communications function (ICF)
communications. To find out more about the error, type option 14 next to the
configuration profile name to run the WRKJOB command.
Active Point-to-Point Jobs:
Figure 90 on page 138 shows some active
point-to-point jobs that AS/400 displays when you do either of the following:
v Press F14 from the WRKTCPPTP display.
v Select option 2 from the Configure Point-to-Point TCP/IP display.
Chapter 4. Configuring Point-to-Point TCP/IP (PPP and SLIP) 137