ADC Release 3.1 Network Card User Manual


 
1152700 Issue 1 February 2001 Section 2 Operation and Maintenance
Page 2-101
2000, ADC Telecommunications, Inc.
DLP-712
Page 3 of 8
limited only by the number of ports in the RNE and the 50 node limit per network. Repeat
this procedure for each STN-EPS shelf that needs to be added to the ring.
Stop! You have completed this procedure.
Cellworx Vision Subnetwork Management System
File Configuration Fault Performance
Software
NMIC Platform
Topology
Time and Date
Connection
10965-E
Refresh...
Remove Expansion Shelf Network Element
Remove Ring Network Element
Add Expansion Shelf Network Element
Add Ring Network Element
Force Network Discovery ...
Turn Up Ring...
Revert to Saved Icon Layout...
Ring Audit
Ring Upgrade
Figure 712-1. Cellworx Vision Add an Expansion Node Pull Down Menu
Cellworx Vision: Add EPS NE - Task Overview
X
1) Enter network element identifiers
2) Enter slot and port numbers
4) Physically connect EPS to ring NE
5) Wait for EPS node to boot
8) Wait for database update
9) Configure software load
10) Verifying EPS interface is a SEPI
10891-E
3) Verify RNE interface is a SEPI
6) Verify NE shelf type
11) Configure ATM mapping to PLCP
12) EPS Added updating topology
7) Validating EPS card type
Figure 712-2. Cellworx Vision Adding an STN-EPS Task Overview Window