DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Upgrading R5si/R6si to R8r EPN and Adding Memory
3-51Release 5/6si to Release 8r
3
Install Cabinet Clips (Systems without
Earthquake Protection)
A cabinet clip is required between each pair of stacked cabinets.
1. At the front of the cabinets, install a cabinet clip between each pair of
cabinets by hooking the clip into the slot of the upper cabinet and
snapping the straight leg of the clip into the slot on the lower cabinet. See
Figure 3-18
.
Figure 3-18. Location of Cabinet Clips
Figure Notes
1. Control Cabinet
2. Port Cabinet or Expansion Control Cabinet
3. Port Cabinet
4. Port Cabinet
5. Cabinet Clips