DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-80Critical Reliability
5
14. Slide the carrier forward 1 to 2 inches; then, from the back, be sure that no
cables or wiring harnesses are caught on the cabinet/carrier framework.
!
CAUTION:
Cables and wiring harnesses can be damaged if they catch on the
framework and if too much pressure is applied in removing the
carrier.
15. Remove the carrier by sliding it out the front of the cabinet.
16. Repeat Steps 12 through 15 for the “A” carrier.
17. On port carrier J58890BB-1, connect the TDM cable or the TDM
terminator to Slot 02. On port carriers J58890BB-2 and J58890BB-3,
connect the TDM cables or the TDM terminator to Slot 01. If the port
carrier has J58890BB-1
and
J58890BB-2 printed on it, treat it as a
J58890BB-1.