Lucent Technologies R8r Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-101Critical Reliability
5
5. Behind control carrier A of EPN cabinet 2:
Install a lightwave transceiver on the cable connector at slot 2A02.
Connect a fiber optic cable to the transceiver just installed.
Route the cable to the cable tray and down, out of the cabinet,
through the cable manager to the PDS cross-connect facility.
Connect the fiber cable to the lightguide interconnect unit provided.
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
6. Behind control carrier A of EPN cabinet 3:
Install a lightwave transceiver on the cable connector at slot 3A02.
Connect the fiber optic cable to the transceiver just installed.
Route the fiber cable to the cable tray and down, out of the cabinet,
through the cable manager to the PDS cross-connect facility.
Connect the fiber cable to the lightguide interconnect unit provided.
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
Coil up the surplus fiber cable and place it in the cable manager.
7. Behind port carrier B of EPN cabinet 2:
Install a lightwave transceiver on the cable connector at slot 2B03.
Connect a fiber optic cable to the transceiver just installed.
Route the fiber cable to the cable tray and down, out of the cabinet,
through the cable manager to the PDS cross-connect facility.
Connect the fiber cable to the lightguide interconnect unit provided.
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
8. Behind port carrier B of EPN cabinet 3:
Install a lightwave transceiver on the cable connector at slot 3B03.
Connect the fiber cable to the transceiver just installed.
Route the fiber cable to the cable tray and down, out of the cabinet,
through the cable manager to the PDS cross-connect facility.
Connect the fiber cable to the lightguide interconnect unit provided.
Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
Coil up the surplus fiber cable and place it in the cable manager.