Lucent Technologies R8r Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Index
IN-2
E
earthquake front plate, 3-50
earthquake protection cabinet clip, 3-51
electromagnetic shielding, 3-50
English day names
table of, 1-19, 2-18, 4-14, 5-38, 5-69, 5-108
English month names
table of
, 1-20, 2-18, 4-14, 5-39, 5-70, 5-109
EPN
TDM/LAN connections
, 6-103, 6-116
TDM/LAN connections for
critical-reliability, 6-139
TDM/LAN connections for
high-reliability
, 6-138
TDM/LAN connections for
standard-reliability
, 6-138
EPN cabinet installation, 6-22
EPN1 fiber optic connections, 3-24
EPN2 fiber optic connections, 3-25, 3-26
expansion control cabinet
circuit pack locations, 3-14
F
fiber
single-mode, 3-27, 3-33
Fiber Link Administration form, A-8 to A-19
administration commands, A-8
instructions
basic fiber link administration
, A-10
DS1 converter boards, A-17, A-18, A-19
DS1C converter boards, A-12, A-16
duplicated fiber link administration, A-11
PNC duplication, 6-37, A-5, A-9
simplex PNC, 6-37, A-5, A-9
fiber optic cable pass-thru kit, 6-8
fiber optic connections, 3-24, 3-26
center stage switch, 3-43
through center stage switch, 3-41
fiber pass-thru kit bracket attachments, 6-17
fiber pass-thru tool, 6-14
fiber-remoted port networks
single-carrier
, 3-22, 3-27
figures, 6-89
blank carrier panel, 6-134
critical-reliability fiber-optic connections
through center stage switch
, 6-105, 6-120
ICC connections for R7r control carrier, 6-91
ICC connections for switch node
carrier
, 6-99, 6-113
location of grounding jumpers, 6-85, 6-88,
6-101, 6-115
locations of grounding jumpers, 6-98, 6-112,
6-135
figures, (continued)
locations of grounding jumpers (small
cabinet)
, 6-134
TDM/LAN connections for critical-reliability
EPN, 6-103, 6-116, 6-139
TDM/LAN connections for critical-reliability
PPN
, 6-117, 6-137
TDM/LAN connections for high-reliability
EPN
, 6-138
TDM/LAN connections for standard-reliability
EPN, 6-138
TDM/LAN connections for standard-reliability
PPN
, 6-136
TDM/LAN connections for standard-reliability
R5r PPN
, 6-84
front plate, 3-50
G
G2 (MCC) Universal Module to R5si+m EPN, 5-1
ground plate, 3-49
ground strap, single-carrier, 3-47
grounding jumpers
locations
, 6-85, 6-88, 6-98, 6-101, 6-112,
6-115, 6-135
locations (small cabinet), 6-134
H
high-reliability
TDM/LAN connections for EPN
, 6-138
TDM/LAN connections for R5r PPN, 6-89
I
ICC connections for R7r control carrier, 6-91
ICC connections for switch node carrier, 6-99,
6-113
ICSU, 6-142
integrated channel service unit, 6-142
integration process
connecting
ITS components
, 6-49, 6-59
ITS to the network, 6-50, 6-53, 6-60
inter-cabinet cable, see ICC, 6-91
Internet Telephony Server
connecting components, 6-49, 6-59
network services, changing, 6-71
ISDN Gateway, 3-5
ISDN interface links
Re-installing
, B-12
isolator, 3-4