DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-98Add a Switch Node Carrier (Standard Reliability)
6
Figure 6-33. Locations of Ground Jumpers
Figure Notes
1. Port Carrier (“C” Position)
2. Ground Jumpers
3. Control Carrier (“A” Position)
4. Switch Node Carrier (“D” Position)
5. Switch Node Carrier (“E” Position)
6. Cabinet with standard fan unit and carrier
7. Cabinet with enhanced fan unit and
enhanced carrier
P1
P2
P1
P1
P1
lcdf003 LJK 021800
P1
P2
P1
P1
P1
1 1
2 2
2 2
3 3
4 4
5 5
6
7