DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-36Standard Reliability
5
Boot the Release 8 System
1. Connect the PC to the “TERMINAL” connector behind PPN control carrier
“A,” or install the G3-MA according to the “Set Up G3-MA” chapter of
DEFINITY Communications System Generic 3 Management Applications
—
Operations
.
2. Insert the translation card in the TN794 faceplate.
3. At the EPN power distribution unit, set the main circuit breaker to ON.
4. At the PPN power distribution unit, set the main circuit breaker to ON.
5. The system performs the reset level 4 rebooting process, loading default
system translations from the translation card. This takes 8 to 11 minutes.
6. Get the order number of the upgrade, and call the regional CSA to request
an “init” login so that the right-to-use options can be enabled on the
upgraded system.
7. To use Access Security Gateway (ASG), see Appendix C, ‘‘Access
Security Gateway’’.