Lucent Technologies R8r Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-29Install a New EPN Cabinet in an Existing System
6
1. At the rear of the Port Carrier in position C in Cabinet 1, install a 9823A
lightwave transceiver onto Slot 2 (1C02). See Figure 6-16
.
2. Connect a 20-foot fiber optic cable to the TX and RX connectors on the
transceiver. Label the cable to make the connections to Cabinet 4 easier.
3. Route the fiber cable to the Port Carrier in position E in Cabinet 4.
4. At the rear of the Port Carrier in position E in Cabinet 4, install a 9823A
lightwave transceiver onto Slot 2 (4E02).
5. Connect the 20-foot fiber optic cable from the Port Carrier in Cabinet 1 to
the TX and RX connectors on the transceiver on the Port Carrier in Cabinet
4. Be sure the cable connected to the TX connector on 1 transceiver is
connected to the RX connector on the other transceiver and vice versa.
6. At the rear of the Expansion Control Carrier in Cabinet 2, install a 9823A
lightwave transceiver onto Slot 1 (2A01).
7. Connect a 20-foot fiber optic cable to the TX and RX connectors on the
transceiver. Be sure to label the cable.
8. At the rear of the Switch Node Carrier in position E in Cabinet 4, install a
9823A lightwave transceiver onto Slot 20 (4E20).
9. Connect the 20-foot fiber optic cable from Cabinet 2 to the TX and RX
connectors on the transceiver on the Switch Node Carrier in Cabinet 4. Be
sure the cable connected to the TX connector on 1 transceiver is
connected to the RX connector on the other transceiver and vice versa.
10. At the rear of the Port Carrier in position D in Cabinet 1, install a 9823A
lightwave transceiver onto Slot 2 (1D02).
11. Connect a 20-foot fiber optic cable to the TX and RX connectors on the
transceiver. Be sure to label the cable.
12. Route the fiber cable to Switch Node Carrier in position E in Cabinet 4.
13. At the rear of the Switch Node Carrier in position E in Cabinet 4, install a
9823A lightwave transceiver onto Slot 3 (4E03).
14. Connect the 20-foot fiber optic cable from Cabinet 1 to the TX and RX
connectors on the transceiver on the Switch Node Carrier in Cabinet 4. Be
sure the cable connected to the TX connector on 1 transceiver is
connected to the RX connector on the other transceiver and vice versa.
15. Connect an H600-278 Metallic Cable from Slot 1 in the Expansion Control
Carrier in Cabinet 4 (4A01) to Slot 19 on the Switch Node Carrier in
position E in Cabinet 4 (4E19).