Lucent Technologies R8r Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Adding or Removing Cabinet Hardware
6-81Add a Control Carrier (Add Duplication)
6
Save Translations
1. Log in at the management terminal.
2. Type
save translation [spe-a] disk
and press
Enter. This command
instructs the system write all translation information from memory to disk.
3. If the PPN or an EPN (where PPN Port Carrier B will be relocated) contains
a TN750 Announcement circuit pack, type
display announcements
and
press
Enter.
4. If administered recorded announcements are listed, type
list
configuration software-version
and press
Enter. Check screen 2 to see
when the announcements were last saved. Save the current
announcements by typing
save announcements
disk
and pressing
Enter.
5. Type
backup disk [spe-a]
and press
Enter. This instructs the system to
backup the current information on disk to the system tape.
6. Update backup tape, if required.
Label Cables
1. To make reconnecting the cables simpler and more reliable, label both
ends of the connector cables associated with the port carrier “B” to be
removed.
Shut Down DEFINITY LAN Gateway System
If a DEFINITY LAN Gateway system resides in the control cabinet to be
upgraded, prepare to shut down the DEFINITY LAN Gateway assembly and
allow the disk to completely spin down.
!
CAUTION:
Before using this procedure to shut down the DEFINITY LAN Gateway,
make sure that you save the system parameters if you plan to reuse the
current system.
!
WARNING:
Neglecting to shut down a DEFINITY LAN Gateway assembly before
powering down the system cabinet where it resides can damage the LAN
Gateway disk.
1. Log onto the DEFINITY LAN Gateway. See
DEFINITY Communications
System Generic 3 Installation, Administration and Maintenance of
CallVisor ASAI over the DEFINITY LAN Gateway
for the procedure to log
in.
2. When the main menu appears, select
Maintenance
.