Lucent Technologies R8r Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Upgrading R5si/R6si to R8r EPN and Adding Memory
3-6Task Tables
3
Task Tables
Table 3-1 provides the high-level tasks to perform the upgrades in this chapter.
Table 3-1. Tasks to Upgrade to Release 8r System
á
Task Description Page
Make Spare Translation Card and Mail to STS for Upgrade
3-8
Busyout Multimedia Interface Circuit Packs 3-9
Save Translations and Announcements 3-9
Follow Routine Preventive Maintenance 3-12
Label Cables 3-12
Check Link Status 3-12
Disable TTI 3-12
Shut Down DEFINITY LAN Gateway System 3-13
Shut Down DEFINITY AUDIX System 3-13
Power Down Existing System 3-13
Disconnect Power and Ground 3-14
Install Emergency Transfer Ground Wire 3-14
Disconnect Equipment and Cables 3-14
Remove Circuit Packs 3-14
Disconnect TDM/LAN Cables and ICC Cables 3-15
Remove the Existing Control Cabinet 3-15
Unpack and Install Expansion Control Cabinet 3-15
Install Port Cabinets 3-15
Install Circuit Packs 3-16
Change Cabinet Address Plugs 3-16
Install TDM/LAN Bus Terminators 3-18
Connect TDM/LAN Cables and ICC Cables 3-20
Interconnect Port Networks with Fiber Optic Cabling — Standard
Reliability Release 8r
3-22
Interconnect Port Networks with Fiber Optic Cabling — High Reliability
Release 8r
3-27
Continued on next page