DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Multicarrier G2 Universal Module to R8r EPN
5-30Standard Reliability
5
4. Behind control carrier A of EPN cabinet 3:
■ Install a lightwave transceiver on cable connector at slot 3A02.
NOTE:
Attenuators may be required for single mode fiber using a
300A Lightwave Transceiver
■ Connect the other end of the fiber optic cable to the lightwave
transceiver, just installed, at slot 3A02. See Figure 5-8
.
■ Carefully attach the fiber optic cable (with cable ties) to the wall of
the cable tray at the built-in cable tie positions.
■ At the top of the cabinet, coil up the surplus fiber optic cable and
attach it to the wall of the cable tray.
Figure 5-5. Standard Reliability Release 8 with Two or Three Port Networks
Figure Notes
1. Cabinet 1 Processor Port Network
2. Cabinet 2 Expansion Port Network 1
3. Cabinet 3 Expansion Port
Network 2