DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
Upgrading R5si/R6si to R8r EPN and Adding Memory
3-7Task Tables
3
Interconnect Port Networks with Fiber Cabling — Critical Reliability
Release 8r
3-33
Connect Power and Ground 3-46
Verify Usable Circuit Pack Vintages 3-47
Install System Access Ports 3-47
Reseat DEFINITY LAN Gateway System 3-47
Reseat DEFINITY AUDIX System 3-47
Remove Emergency Transfer Ground Wire 3-47
Reboot the System 3-48
Restart DEFINITY LAN Gateway System 3-48
Label Main Distribution Frame 3-48
Reconnect Cables 3-49
Power Up the EPN Cabinet 3-49
Install Rear Ground Plates (Systems with Earthquake Protection) 3-49
Install Cabinet Clips (Systems without Earthquake Protection) 3-51
Install Cable Clamps 3-52
Retranslate Port Circuits 3-52
Re-record Announcements (TN750/B Only) 3-53
Administer Fiber Links 3-53
Enable TTI 3-53
Check Link Status 3-53
Resolve Alarms 3-53
Enable Customer Options and Alarm Origination to INADS 3-54
Save Translations 3-55
Return Replaced Equipment 3-55
Table 3-1. Tasks to Upgrade to Release 8r System — Continued
á
Task Description Page
Continued on next page