Lucent Technologies R8r Server User Manual


 
DEFINITY Enterprise Communications Server Release 8.2
Upgrades and Additions for R8r
555-233-115
Issue 1
April 2000
G3vs with Intel 386 or Risc Processor to R8r
4-9Remove the Present System
4
Shut Down DEFINITY AUDIX System
!
WARNING:
Neglecting to shut down an AUDIX assembly before powering down the
system cabinet where it resides can damage the AUDIX disk.
1. If a DEFINITY AUDIX System resides in the system to be upgraded, shut
down the AUDIX assembly and allow the disk to completely spin down.
Refer to
‘‘DEFINITY AUDIX Power Procedures’’ on page 4-19
.
2. Unseat the AUDIX assembly from its backplane connectors.
Power Down Present System
!
CAUTION:
Powering down the PPN will cause important system data, such as BCMS
data, records of queued ACD calls, Automatic Wakeup requests, and Do
Not Disturb requests to be lost. Refer to DEFINITY Enterprise
Communications Server Release 8 Maintenance for R8r, for information
about preparing the system for a power down.
1. At the PPN cabinet power supply, set the main circuit breaker to OFF.
Install Emergency Transfer Ground Wire
!
CAUTION:
To avoid contaminating single-point ground, do not connect the ground
strap while the system is powered up.
1. Connect a 10 AWG (#25) (2.6 mm
2
) wire either to pin 49 of the connecting
block or to pin 49 of the CAP (cable access panel) associated with the
emergency transfer panel.
2. Route the other end of the wire to an approved ground and connect.