Lucent Technologies Release 8.2 Server User Manual


 
Configuration 2: R7r (+CMS) <—ethernet—> R7csi 3 C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
98
Enable links and processor channels
You must enable links and processor channels before the connections can be used.
To enable a link, open its data module screen (ch da [ext]) and set the Enable
Link? field to y.
[note: to view a list of assigned data modules and their extensions, enter the “list
data-module” command (l da)]
To enable the processor channels, open the processor channel screen (ch com p)
and set the Enable field to y for each assigned processor channel.
Note: 1. You must disable a link or processor channel before you can change its
parameters.
Note: 2. The busy-out command overrules the data module Enable Link? field.
Note: 3. On the C-LAN boards, low-level connectivity can remain intact when
higher-level applications such as DCS are not functioning. For example,
an external ping to a C-LAN’s ethernet port could be successful even
when the board is busied-out. When debugging connectivity problems,
pinging only checks low-level connectivity.