Lucent Technologies Release 8.2 Server User Manual


 
Configuration 1: R8r <—ppp—> R8si
61
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000 CID: 77730
3 C-LAN Administration
Prerequisite Administration
There are some system administration tasks that need to be completed before you can
proceed with the connectivity administration described in this section.
Review the checklist of prerequisite administration tasks in Checklist for Prerequisite
Administration (page 54), before proceeding with the connectivity administration in
this section.
SWITCH 1 SWITCH 2
Configuration 1
DEFINITY ECS R7r
DEFINITY ECS R7si
Processor
channels
Processor
channels
Interface
channels
Interface
channels
1
2
12
384
1
5000
5001
x(any)
64500
1
2
21
256
Link 1
Link 3
1
5000
5001
5003
64500
hardware connections
Processor
UN331B
Processor bus
Processor
TN790B
Processor bus
TDM bus
TDM bus
Packet busPacket bus
NetPkt
TN794
DS1
TN767/
TN464
DS1
TN767/
TN464
C-LAN
TN799
Voice data
ppp data
Network
control
UN332B
2
1
cydfec1a EWS 052099
node-1
Ext 2010
loc 1b0115
192.168.10.31
node-2
Ext 3020
loc 1a1206
192.168.10.32
1
2
C-LAN
TN799
PktInt
TN1655
software-defined connections