Configuration 4: R8csi <—ISDN—> R8si Gateway
<—ppp—> R8csi
3 C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
124
Configuration 4: R8csi <—ISDN—> R8si Gateway <—ppp—> R8csi
In this configuration, a DEFINITY ECS R8r provides gateway conversion between
ISDN and TCP/IP.
Task Summary
The following tasks need to be completed for Switch 1, Switch 2, and Switch 3:
1 Review checklist
2 Switch 1 administration
a Assign node names
b Assign signaling group and administered NCA TSC
c Assign ISDN-TSC Gateway Channel
d Assign link (via a data module) to node 3
e Assign processor channels
3 Switch 2 administration
a Assign signaling group and administered NCA TSC
4 Switch 3 administration
a Enable bus bridge connectivity
b Assign node names
c Assign link (via a data module) to node 1
d Assign processor channels
5 Enable links and processor channels
DEFINITY
ECS R8si
ISDNSwitch 1
DEFINITY ECS
Switch 3
DEFINITY ECS
Switch 2
R8csi
ppp
R8csi
DS1
DS1
node-3
node-1
DS1
C-LAN
DS1
C-LAN