Configuration 2: R7r (+CMS) <—ethernet—> R7csi 3 C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
74
Task Summary
The following tasks need to be completed for Switch 1 and Switch 2:
1 Review prerequisite administration checklist
2 Switch 1 administration
a Assign node names
b Assign IP Interfaces
c Assign link (via a data module) to the LAN
d Assign processor channels
3 Switch 2 administration
a Enable bus bridge connectivity
b Assign node names
c Assign IP Interfaces
d Assign link (via a data module) to the LAN
e Assign IP routes
f Assign processor channels
4 Intuity AUDIX administration
a Administer the UNIX name and IP address
b Administer the switch interface link
c Administer extension numbers, channels, and services
d Administer subscribers
5 CMS administration.
See CentreVu CMS Software Installation and Setup, 585-215-866 and CentreVu
CMS Switch Connections and Administration, 585-215-876 for details of CMS
setup and administration. (For Intuity AUDIX connections, see Intuity Messaging
Solutions LAN Integration with DEFINITY ECS, 585-313-602.)
6 Enable links and processor channels