Configuration 5B: R8csi <—ppp—> R8r (2 C-LANs)
<—ethernet—> R8si
191
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000 CID: 77730
3 C-LAN Administration
Switch 2 Task — Assign Link via ppp Data Module to Switch 1
This task administers a ppp data module on Switch 2 for the ppp connection to Switch
1. The data module associates a link number with a port address, extension number,
and node name for the C-LAN port used for this connection.
Begin
Steps
>
Open Data Module form — enter ad da 3020
> Enter values
add data-module 3020
Page 1 of x
DATA MODULE
Data Extension: 3020 Name: _ppp on link 1 to node-1a-ppp BCC: 2
Type: ppp COS: 1
Port: 01a0413 COR: 1
Link: 1_ TN: 1
Enable Link? n
Node Name: node-2___ _
Subnet Mask: 255.255.255.0
Establish Connection: n
DESTINATION
Digits:
__________
Node Name: node-1a-ppp______
CHAP? n
Field Conditions/Comments
Type: This indicates the data-module type for this connection.
Port: In this example, the C-LAN circuit pack is in slot 01a04; the ppp
connection is through port 13.
Link: The link number must be in the range 1 – 25 (for R8csi), not
previously assigned on this switch
Enable Link? If you need to add an IP route that uses this node as a gateway,
this field must be set to
y before adding the IP route. Otherwise
leave this field set to
n until the link administration is complete;
that is, until after all data modules and the processor channels
are assigned, then set to
y.
Name: Information-only; appears in list generated by the “list data
module” command.
BCC: Bearer Capability Class. This is a display-only field.
1 of 2