Lucent Technologies Release 8.2 Server User Manual


 
Configuration 4: R8csi <—ISDN—> R8si Gateway
<—ppp—> R8csi
141
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000 CID: 77730
3 C-LAN Administration
Switch 3 Task — Assign Link via ppp Data Module to Switch 1
This task administers a ppp data module on Switch 3 for the ppp connection to Switch
1. The data module associates a link number with a port address, extension number,
and node name for the C-LAN port used for this connection.
Begin
Steps
>
Open Data Module form — enter ad da n
[This data module is assigned the extension 2801; you can assign any unused
extension in the dial plan.]
> Enter values
add data-module next
Page 1 of x
DATA MODULE
Data Extension: 2801 Name: _ppp on link 1 to node-1___ BCC: 2
Type: ppp COS: 1
Port: 01a0906 COR: 1
Link: 1_ TN: 1
Enable Link? n
Node Name: node-3 ____
Subnet Mask: 255.255.255.0
Establish Connection: n
DESTINATION
Digits: ________
Node Name: node-1_____
____
CHAP? n
Field Conditions/Comments
Type: This indicates the data-module type for this connection.
Port: In this example, the C-LAN circuit pack is in slot 01a09; the
ppp connection is through port 06.
Link: The link number must be in the range 1 – 25 (for R8csi), not
previously assigned on this switch.
Enable Link? If you need to add an IP route that uses this node as a
gateway, this field must be set to
y before adding the IP route.
Otherwise leave this field set to
n until the link administration
is complete; that is, until after all data modules and the
processor channels are assigned, then set to
y.
Name: Information-only; appears in list generated by the “list data
module” command.
1 of 2