Lucent Technologies Release 8.2 Server User Manual


 
Configuration 5B: R8csi <—ppp—> R8r (2 C-LANs)
<—ethernet—> R8si
3 C-LAN Administration
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
182
Switch 1 Task — Assign Link via ppp Data Module to C-LAN(b)
This task administers a ppp data module on Switch 1 for the ppp connection from the
C-LAN(a) circuit pack to the C-LAN(b) circuit pack.
Begin
Steps
>
Open Data Module form — enter ad da 2013
> Enter values
add data-module 2013
Page 1 of x
DATA MODULE
Data Extension: 2013 Name: _ppp on link 12 to clan(b)__ BCC: 2
Type: ppp COS: 1
Port: 01c0713 COR: 1
Link: 12 TN: 1
Enable Link? n
Node Name: node-1a _____
Subnet Mask: 255.255.255.0
Establish Connection: y
DESTINATION
Digits: 2378___________
Node Name: node-1b_____
______
CHAP? n
Field Conditions/Comments
Type: This indicates the data-module type for this link.
Port: In this example, the C-LAN(a) circuit pack is in slot
01a07; the ppp connection is through port 13.
Link: The link number must be in the range 1 – 33 (for R8r), not
previously assigned on this switch.
Enable Link? If you need to add an IP route that uses this node as a
gateway, this field must be set to
y before adding the IP
route. Otherwise leave this field set to
n until the link
administration is complete; that is, until after all data
modules and the processor channels are assigned, then set
to
y.
Name: Information-only; appears in list generated by the “list
data module” command.
BCC: Bearer Capability Class. This is a display-only field.
1 of 2