Lucent Technologies Release 8.2 Server User Manual


 
461
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000 CID: 77730
G References
Installation and
maintenance
DEFINITY ECS Release 8.2 — Installation and Test for Single-Carrier Cabinets,
555-233-120, Issue 1
Provides procedures and information for hardware installation and initial testing of
single-carrier cabinets. This document is availabe in languages other than English and
can be ordered from the BCS Publications Catalog web site.
DEFINITY ECS Release 8.2 — Installation and Test for Multi-Carrier Cabinets,
555-233-114, Issue 1
Provides procedures and information for hardware installation and initial testing of
multi-carrier cabinets.
DEFINITY ECS Release 8.2 — Installation for Adjuncts and Peripherals,
555-233-116, Issue 1
Provides procedures and information for hardware installation and initial testing of
ECS adjunct and peripheral systems and equipment.
DEFINITY ECS Release 8.2 — Installation and Test for Compact Modular
Cabinets, 555-233-118, Issue 1
Provides procedures and information for hardware installation and initial testing of
compact modular cabinets.
DEFINITY ECS Release 8.2 — ATM Installation, Upgrades, and Administration,
555-233-124, Issue 1
Provides step-by-step instructions for how to install, upgrade, and administer ATM
switches.
DEFINITY ECS Release 8.2 — Installation and Maintenance for Survivable
Remote EPN, 555-233-121, Issue 1
Describes how to install, cable, test, and perform maintenance on a Survivable
Remote Expansion Port Network (SREPN). Provides power, ground, and fiber
connections.
DEFINITY ECS Release 8.2 — Upgrades and Additions for R8.2r, 555-233-115,
Issue 1
Provides procedures for an installation technician to upgrade an existing DEFINITY
Communications System or DEFINITY ECS to DEFINITY ECS Release 8.2.
Includes upgrade considerations, lists of required hardware, and step-by-step upgrade
procedures. Also includes procedures to add control carriers, switch node carriers,
port carriers, circuit packs, auxiliary cabinets, and other equipment.
DEFINITY ECS Release 8.2 — Upgrades and Additions for R8.2si, 555-233-122,
Issue 1
Provides procedures for an installation technician to upgrade an existing DEFINITY
Communications System or DEFINITY ECS to DEFINITY ECS Release 8.2.
Includes upgrade considerations, lists of required hardware, and step-by-step upgrade
procedures. Also includes procedures to add control carriers, switch node carriers,
port carriers, circuit packs, auxiliary cabinets, and other equipment.